![]() If you have specific dates for some tasks and just a rough idea for others you can enter the information, even using text in the duration, start or finish columns. When tasks are in this manually scheduled mode, Project will not automatically calculate and fill in dates for you. For example, when you start typing tasks the Start, Finish & Duration fields are blank. Tasks are by default manually scheduled, meaning that you have complete control over their dates. But at any time, you have the flexibility to manually override Project’s automatic calculations to better capture all of the high-level, possibly vague information that you have when you start your project. If and when appropriate, you can leverage Project’s powerful scheduling engine to help forecast the date of a task based on various factors like dependencies, calendar, constraints, etc. The idea is that you, as the project manager, can have complete control over when a task should happen. This consists of a collection of features designed to make Project a more flexible planning and schedule management tool. In Project 2010 the concept called User-Controlled Scheduling was introduced.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |